Chief Seattle Thelma Dewitty Thomas Foley Carrie Chapman Catt Anna Louise Strong Mark Tobey Helene Madison Home
Search Encyclopedia
Facebook
Advanced Search
Donate Now! Book Store Featured Eassy Sponsor of the Week
Home About Us Contact Us Education Bookstore Tourism Advanced Search
6771 HistoryLink.org essays now available      
Donate Subscribe

Shortcuts

Libraries
Cyberpedias Cyberpedias
Timeline Essays Timeline Essays
People's Histories People's Histories

Selected Collections
Cities & Towns Cities & Towns
County Thumbnails Counties
Biographies Biographies
Interactive Cybertours Interactive Cybertours
Slide Shows Slideshows
Public Ports Public Ports
Audio & Video Audio & Video

Research Shortcuts

Map Searches
Alphabetical Search
Timeline Date Search
Topic Search

Features

Book of the Fortnight
Audio/Video Enhanced
History Bookshelf
Klondike Gold Rush Database
Duvall Newspaper Index
Wellington Scrapbook

More History

Washington FAQs
Washington Milestones
Honor Rolls
Columbia Basin
Everett
Olympia
Seattle
Spokane
Tacoma
Walla Walla
Roads & Rails

Timeline Library

< Browse to Previous Essay | Browse to Next Essay >

Allen Street (Kelso) Bridge collapses, with loss of life, on January 3, 1923.

HistoryLink.org Essay 7406 : Printer-Friendly Format

On Wednesday evening, January 3, 1923, the Allen Street Bridge in Kelso, Washington, collapses into the Cowlitz River as workers are returning home from work. The bridge, built in 1906 entirely of wood, has been weakened by recent flooding and overuse. When a large traffic jam puts excessive stress and strain on the old bridge, a suspension cable breaks, toppling the supporting towers and dropping the entire structure into the river. Scores are immediately rescued from the wreckage but further efforts are severely hampered by bad weather and darkness. Authorities believe that at least 35 people die in the disaster, but, because of the large number of transients working in the area, an exact figure will never be known. In terms of fatalities, this is Washington's worst bridge disaster.

Building Longview

In 1921, the Long-Bell Lumber Company, Kansas City, Missouri, purchased 11,000 acres of flat valley land between the Cowlitz and Columbia rivers, about four miles west of Kelso, with the intention of building two lumber mills.  It soon became apparent that several thousand laborers would be needed to operate the mills.  Kelso, founded in 1847, was the nearest population center and had fewer than 2,000 residents.  Rather than allow a sprawling mill town to develop, Long-Bell decided to build a planned city, which was dedicated in July 1923 as Longview. 

During the two years of construction, Kelso was besieged with transient laborers, putting severe strains on the town’s infrastructure.  Aside from private ferry boats, the Allen Street Bridge was the only way across the Cowlitz River and it carried a huge amount vehicle and pedestrian traffic traveling to and from the Long-Bell construction site.

A Bridge Built of Wood

The Allen Street Bridge, known locally as the Kelso or Cowlitz Bridge, was built entirely of wood in 1906, connecting the towns of Kelso and Catlin (now West Kelso).  It was a narrow, 600-foot, two-lane, bascule-type drawbridge that used counterbalance weights in overhead towers to assist the machinery in pivoting the deck upward, opening a passageway for vessels. Two piers of heavy pilings provided the foundations for the structure.

The bridge replaced another wooden bridge destroyed in 1906 by a flood.  Although renovated in 1915, by 1920 the wooden bridge was said to be in such poor condition that many Kelso residents refused to use it.  To meet the needs of heavy traffic, the Washington State Highways Department, in association with Cowlitz County and the City of Kelso, started construction on a replacement, down river and close to the old bridge, in early 1922.  The new Allen Street Bridge, with four lanes and a vertical lift span, was constructed entirely of steel and cement by the Pacific Bridge Company.  It went into full service a few weeks after the collapse of the old bridge, on Monday morning, March 19, 1923.

Wind and Rain

1922 was one of the driest years in Washington state since record keeping began in 1895.  Annual rainfall was nine inches below normal.  But the weather changed in December, bringing nearly one third the total rainfall for the year.  The rivers in Washington and Oregon were running at flood stage and full of logs and debris, threatening bridges.  Barge cranes and dynamite were used to dislodge the logjams which gathered about bridge piers, exerting tons of pressure.

On December 31, 1922, a terrific storm hit the Pacific Northwest.  The weather station on Tatoosh Island recorded a phenomenally low barometric reading of 29.02 inches.  The North Head weather station near the mouth of the Columbia River recorded gale force winds from the southwest at 76 miles per hour.  Seattle reported receiving almost an inch of rain and other areas, much more.  Over the next several days, storms continued moving in from the Pacific Ocean, bringing torrential rains, swelling rivers, and causing floods.  Even by Pacific Northwest standards, it was extremely wet.  The Cowlitz River, at 15 feet above normal, was nearing flood stage.

The Cable Snaps

On Wednesday evening, January 3, 1923, there was the usual rush of traffic across the Allen Street Bridge as people returned home from work.  The drawbridge had just been lowered and a mass of vehicles and pedestrians were waiting to cross.  A stalled car at one end and two horse-drawn wagons at the other slowed traffic across the bridge to a crawl.  At about 5:00 p.m., the upstream steel support cable at the east anchorage of the bridge tore loose, running through a pulley at the top of the east tower, with a loud report.  When the east end cable snapped, it released tension on one side of the bridge, toppling the two supporting towers and middle span into the river.

The middle span, approximately 300 feet in length, turned over as the west tower slowly fell, spilling trucks, automobiles, and pedestrians into the swift, muddy river 20 feet below.  The draw span dropped like a trap door, dumping all the vehicles and pedestrians into the water.  The east tower fell onto the new bridge, still under construction, and broke apart, but the east approach to the bridge was left standing.  The collapse also broke the water mains and telephone lines to West Kelso.  The broken telephone lines fell across high voltage power lines, shorting out transformers in Kelso and plunging the city into darkness.

When the bridge started to collapse, the pedestrians near the ends scrambled back to the riverbank, escaping unhurt.  Many people thrown into the water saved themselves from drowning by crawling across wreckage to shore or by hanging onto floating debris until rescued. The steamers Pomona and Cowlitz along with several other small steamboats working in the area were credited with saving at least 40 lives.

The wreckage was immediately secured to the new bridge and along the riverbank so that later on it could be thoroughly searched for trapped bodies.  By 6:00 p.m. no bodies had been recovered, but several had been reported floating down the Cowlitz toward the Columbia River, three miles downstream. Although hampered by darkness and heavy rain, rescue workers continued searching for victims throughout the night, using flashlights.

Rescue Efforts Continue

On Thursday morning, January 4, 1923, the Cowlitz County Coroner’s Office brought in three divers to search the river bottom around the collapsed bridge and under the wreckage.  Wires were stretched across the mouth of the Cowlitz to catch any bodies floating down the river.  By 10:00 a.m., still no bodies had been recovered.  The Pacific Bridge Company began the task of hauling motor vehicles and timbers out of the river with a barge crane.  Although many of the rescue workers were convinced that few bodies, if any, would be found in the tangled cables and wreckage, they continued searching in earnest.  Crews grappled for bodies up and down the Cowlitz all day long without result.

Over the next several days, heavy rain continued to fall and the Cowlitz River continued to rise, greatly hampering rescue and salvage efforts.  The Pacific Bridge Company stopped clearing the wreckage, and rescue workers and divers, menaced by logs and debris racing down river, suspended their search for victims.  Instead, they concentrated their efforts exploring the riverbanks, eddies, and flooded areas below Kelso.

On Wednesday, January 10, 1923, freezing weather returned to Washington, turning the rain into snow at higher elevations.  Although rain continued to fall in Cowlitz County, river levels dropped rapidly and flood waters began to subside.  The weather station in Portland, Oregon, 45 miles south of Kelso, reported that nine inches of rain had fallen there since January 1st.

On Saturday, January 13, 1923, the water level in the Cowlitz River had dropped sufficiently to allow the search for victims to resume.  Barge cranes from the Pacific Bridge Company and the Silver Lake Railway and Lumber Company went to work clearing wreckage and a hauling a few trucks and automobiles from the river.  As workers grappled, divers continued searching the river bottom near the bridge and under the wreckage, and a large fleet of vessels patrolled down-river, looking for victims.  Charges of dynamite were set off in the water at 200-foot intervals in the three-mile stretch from Kelso to the confluence with the Columbia River, to loosen any bodies stuck in the mud on the river bottom.

By Wednesday, January 17, 1923, Cowlitz County Coroner William D. Van Note concluded that a further search for victims and vehicles would be unprofitable.  Out of 13 automobiles belonging to known victims, only six had been recovered and Van Note knew there were more vehicles in the river. Flood waters covered the river bottom with several feet of sand, burying everything.  Divers searched the entire riverbed, described as being as smooth as a beach, for a considerable distance below the bridge without finding a trace of a vehicle.  Two vehicles and a wagon located four days earlier had to be dug out of the sand with a dredge.  But no bodies were recovered.

The Extent of the Disaster

Eyewitnesses reported there were between 100 and 150 people and as many as 20 vehicles crossing the bridge when the cable snapped.  No one on the east approach or draw span was killed.  The loss of life all came from the middle span, which was the first thing to fall.  Fortunately, most of the pedestrians were able to vacate the span before it turned over.  Fourteen people were taken to the Kelso Hospital with serious injuries, but only two died: Harold Kirk, age 35, an employee of the Long-Bell Lumber Company, and George R. McDonald, age 36, a plumber from Vancouver, Washington.

Based on a careful check of homes, rooming houses, hotels, and places of employment throughout the area, Coroner Van Note estimated that 35 to 40 people were missing.  This included at least a dozen men loitering about the Long-Bell employment office in West Kelso throughout the day, who had started for East Kelso at about the time of the disaster.

The list of known victims continued to change for days after the accident, as persons reported missing were found alive.  An exhaustive search for bodies down the Cowlitz and Columbia Rivers proved fruitless; no bodies connected to the disaster were ever found.  The coroner’s official tally was two persons dead and 18 persons known missing. The exact figure would never be known as many of the victims were transient day-laborers either looking for work or employed at the Longview construction site by contractors.  Claims for death or injury resulting from the bridge collapse were filed against Cowlitz County and the City of Kelso, eventually totaling over $500,000.

"A Toothpick Could Topple It"

A coroner’s inquest was never held and experts differed as to the immediate cause of the disaster.  Mr. A. J. Haley, a structural engineer from Astoria, Oregon, said the old Allen Street Bridge should have been declared unsafe and closed when, on December 23, 1922, the Silver Lake Railway and Lumber Company’s log boom, located between Castle Rock and Kelso, broke loose, sending over three million board-feet of timber down the river.  A huge logjam occurred at the bridge, exerting tons of pressure and loosening the piers of the supporting towers.  The logjam, one of the worst in the history of the bridge, was finally cleared on the day before the collapse.  On December 25, 1922, Haley stated publicly that the bridge was so unstable that “a toothpick might topple it over” (The Seattle Times).

Mr. J. F. Hamilton, the engineer in charge of constructing the new bridge, said he had inspected the suspension cables on the old bridge a few days before the collapse and found them in good condition.  He had no explanation why a cable broke.  Other experts opined the suspension cable failed due to excessive stress and strain on the bridge caused by the large traffic jam.  The old wooden bridge simply wasn’t designed to carry the amount of weight or volume of traffic brought about by Long-Bell’s construction of Longview.  Although there was never an official determination, it was undoubtedly a combination of circumstances and events that caused the disaster.

Killed in the Bridge Collapse

  • Harold Kirk, age 35, Kelso, Washington
  • George R. McDonald, age 36, Vancouver, Washington

Victims Known to Be Missing

  • Benjamin Barr, Woodland (Cowlitz County Commissioner-elect)
  • F. M. Beacon, Seattle
  • W. V. Buck, Kalispel, Montana
  • Ralph Chamberlain, Alberta, Canada
  • Alan Chisholm, Moose jaw, Saskatchewan, Canada
  • John Cooper, De Ridder, Louisiana
  • W. P. Croake, Tacoma
  • John Godfrey, Kelso
  • Luther J. Hall, age 27, Mt. Solo (Longview)
  • William F. Heartley, age 56, Kelso
  • Alonzo G. Huntington, age 57, Kelso
  • Mrs. Maria Florence Huntington, age 55, Kelso
  • Lloyd G. Huntington, age 34, Kelso
  • Emil Johnson, age 40, Kelso
  • Harold Millard, Woodland
  • Earl Pennel, Kelso
  • W. F. Philo, Portland, Oregon
  • Robert Titland, Tacoma

Sources:
Camilla G. Summers, About Kelso, Cowlitz County, Washington (Longview, WA: Speedy Litho Press, 1982); “Allen Street Bridges,” in the History of Cowlitz County, Washington, ed. by Ruth Ott and Dorothy York (Dallas: Taylor Publishing Co., 1983); “Bridge Endangered by Cowlitz River Freshet,” The Kelsonian (Kelso, Washington), December 27, 1922, p. 1; “Collapsed Bridge Takes Awful Toll,” Ibid., January 6, 1923, p. 1; “Eye Witnesses Tell of Disaster,” Ibid., January 6, 1923, p. 2; “Harrowing Tales Told,” Ibid., January 6, 1923, p. 4; “Three Listed as Missing Located,” Ibid., January 10, 1923, p. 1; “Search for Bridge Victims Resumed Today,” Ibid., January 13, 1923, p. 1; “Autos Buried Under Sand,” Ibid., January 17, 1923, p. 1; “Construction at Longview Continues Despite Rain,” Ibid., January 20, 1923, p. 1; “Damage Claims filed for Cowlitz Bridge Collapse,” Ibid., January 31, 1923, p. 1; “Steel Work Done on Bridge,” Ibid., February 3, 1923, p. 1; “New Bridge Opens Mar. 19; Traffic Limited,” Ibid., February 7, 1923, p. 1; “Cowlitz County rejects All Bridge Collapse Claims,” Ibid., March 14, 1923, p. 1; “Cowlitz Bridge Opens Monday,” Ibid., March 17, 1923, p. 1; “Kelso to Fight Bridge Suits,” Ibid., April 18, 1923, p. 1. “68-Mile Gale Lashes Puget Sound Waters,” Seattle Post-Intelligencer, January 1, 1923, p. 1; “Span Gives Way Under Weight of Traffic Jam Due to Stalled Auto,” Ibid., January 4, 1923, p. 1; “4 More Names Swell List of Span Victims,” Ibid., January 5, 1929, p. 1; “Children Lost in Bridge Fall Found Saved,” Ibid., January 6, 1929, p. 2; “Swollen River Stops Bridge Rescue Work,” Ibid., January 7, 1923, p. 10; “Flood Stops Kelso Search,” Ibid., January 8, 1923, p. 1; ”18 Autos and 150 People Are Thrown into Stream,” The Seattle Star, January 4, 1923, p. 1; “Disaster Up To Big Business,” Ibid., January 5, 1923, p. 1; “River Imperils Kelso Workers,” Ibid., January 6, 1923, p. 1; “Dike Breaks at Kelso,” Ibid., January 8, 1923, p. 1; “Kelso Wreck Total Now 19,” Ibid., January 9, 1923, p. 1; “May Ask Kelso Bridge Probe,” Ibid., January 10, 1923, p. 1; “Flood Waters Are Receding,” Ibid., January 10, 1923, p. 10; “Searching for Kelso Victims,” Ibid., January 13, 1923, p. 1; “Seattle Hit By 52-Mile Gale; Ships Imperiled,” The Seattle Times, January 1, 1923, p. 1; “2 Dead and 16 Missing in Collapse of Bridge, Ibid., January 4, 1923, p. 1; “Engineer Gave Warning Before Bridge Dropped,” Ibid., January 5, 1923, p. 1; “3 More Are Missing,” Ibid., January 7, 1923, p. 2; Craig Holstine and Richard Hobbs, Spanning Washington: Historic Highway Bridges of the Evergreen State (Pullman: WSU Press, 2005).


Travel through time (chronological order):
< Browse to Previous Essay | Browse to Next Essay >

Special Suite: Bridges |

Related Topics: Roads & Rails | Calamities | Washington Rivers |

Licensing: This essay is licensed under a Creative Commons license that encourages reproduction with attribution. Credit should be given to both HistoryLink.org and to the author, and sources must be included with any reproduction. Click the icon for more info. Please note that this Creative Commons license applies to text only, and not to images. For more information regarding individual photos or images, please contact the source noted in the image credit.
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported License


Major Support for HistoryLink.org Provided By: The State of Washington | Patsy Bullitt Collins | Paul G. Allen Family Foundation | Museum Of History & Industry | 4Culture (King County Lodging Tax Revenue) | City of Seattle | City of Bellevue | City of Tacoma | King County | The Peach Foundation | Microsoft Corporation, Other Public and Private Sponsors and Visitors Like You


This essay made possible by:
The State of Washington
Washington State Department of Archaeology and Historic Preservation


Allen Street Bridge (1906, collapsed 1923), Kelso, ca. 1910
Courtesy Cowlitz County Historical Museum


Allen Street Bridge (1906, collapsed 1923), from east bank of Cowlitz River, Kelso, ca. 1910
Courtesy Cowlitz County Historical Society


Seattle Post-Intelligencer headline on Kelso bridge collapse, January 4, 1923



Autos being lifted from Cowlitz River after Allen Street Bridge collapse, Kelso, January 4, 1923
Courtesy Cowlitz County Historical Museum


Wreckage of Allen Street Bridge against half-built new bridge, Kelso, January 4, 1923
Courtesy Cowlitz County Historical Museum


New Allen Street Bridge, made of steel and cement, under construction, Kelso, 1923
Courtesy Cowlitz Historical Museum


Topographical map of Longview and Kelso, Cowlitz County, July 1, 1974
Courtesy U.S. Geological Survey


Aerial view of Kelso, Longview, and the Cowlitz River, August 4, 2000
Courtesy U.S. Geological Survey


 
Home About Us Contact Us Education Bookstore Tourism Advanced Search

HistoryLink.org is the first online encyclopedia of local and state history created expressly for the Internet. (SM)
HistoryLink.org is a free public and educational resource produced by History Ink, a 501 (c) (3) tax-exempt corporation.
Contact us by phone at 206.447.8140, by mail at Historylink, 1411 4th Ave. Suite 803, Seattle WA 98101 or email admin@historylink.org